This printable crossword puzzle has 28 clues. Answers range from 4 to 17 letters long. This crossword is also available to download as a Microsoft Word document or a PDF.
_________ percent of a building’s total cost is spent in the design and construction phase of a project.
Rising cost of ___________ such as utilities, equipment and labor create challenges for building owners.
The pressure to deliver high quality, flexible and ________ structures into the built environment will be under increasing scrutiny.
Buildings ________ 40% of the total energy use in the United States.
Inaccurate or unorganized building data accounts for a 60 % reduction in staff ________.
The use if BIM for facility operations can create ___________ life-cycle savings.
Successful closeout information delivery starts in the project ________ phase.
The technology and formatting used in many as built (record) documents is the technology and formatting used, which is ___________ to the information that is needed.
__________ deliverables can be defined as static project documentation
__________ deliverables can be defined as static project documentation.
The key factor in artifacts is that they lack the _________ to change over time and are not an effective means of updating information throughout the life of a facility.
PDF was originally developed as an ___________ means of facilitating electronic document exchange.
Record drawings are often not useful to facility managers because their intended use was to construct a facility, not __________ it.
A downside to the use of CAD files as record documents is the lack of __________ within the files.
As a means of updating information, both graphically and linking to static artifacts, BIM is an invaluable tool as a _________ deliverable.
Unlike CAD, BIM represents a way of consistently updating _________ information without having to find and revise multiple CAD files.
BIM creates a dynamic means of capturing and updating _________ facility information for a project quickly
Owners are realizing the value of an accurate as-built model as a project ___________.
Some of the biggest costs associated with the current system of information handover is ________ time in trying to locate information for maintenance activities.
Some of the biggest costs associated with the current system of information handover is ________ time in trying to locate information for maintenance activities.
A _______BIM is the single, current, composite reference model for a structure that references information about the project.
The record BIM may change over time as facility information is _________.
The construction manager may use survey tools in creating the record BIM to capture constructed conditions and __________ existing subcontractor or fabricator models to create the record BIM.
The reality is that BIM is becoming a fabrication model for contractors and an ______as-built product.
There is a tremendous opportunity for the entire (project) team to better collaborate and leverage BIM as a source of additional scope, responsibility and potentially, _______.
Many owners are asking for phased _______ scans to be completed of their facilities that they can have converted into models downstream if needed.
Autodesk Recap can create a 3D model from a collection of _____ of a particular focus area in the facility.
The facility BIM model needs to be developed for an _________ purpose.